Step 1: Initial Assessment & Planning

Evaluate the current condition of the property

Identify structural or functional issues

Discuss goals and budget with the client

Take measurements and photographs for reference

Step 2: Budgeting & Design

Prepare a detailed cost estimate

Decide on the design style and materials

Create floor plans, 3D models, or mood boards

Get approvals and finalize the plan

Step 3: Permits & Approvals

Check local building regulations

Obtain necessary permits for construction, electrical, or plumbing work

Schedule inspections if required

Step 4: Demolition & Preparation

Remove outdated fixtures, walls, or flooring as needed

Prepare the site for construction

Ensure safety measures and waste disposal plans

Step 5: Structural & Construction Work

Make necessary structural changes (walls, beams, support)

Electrical and plumbing upgrades

Insulation and other foundational improvements

Step 6: Interior & Finishing

Install flooring, cabinetry, and furniture

Apply paints, wallpapers, or wall finishes

Add lighting, fixtures, and appliances

Step 7: Quality Checks & Final Touches

Inspect all work for quality and safety

Clean and stage the space

Make minor adjustments based on client feedback

Step 8: Handover & Maintenance Tips

Walkthrough with the client

Provide maintenance tips for materials and installations

Collect feedback and document the project for portfolio